• 90后听障女孩北漂学舞 王力宏为她写歌:我欣然接受我的不完美 2019-02-01
  • 崇尚英雄 精忠报国——我们家的报国故事 2019-01-28
  • 报告显示: 中国海外人才归国逐年上升 2019-01-28
  • 豆渣-热门标签-华商生活 2019-01-27
  • 力度空前!个税起征点提高至每月5000元!还有这些消息与你的钱包有关 2019-01-11
  • 比利时并不轻松地击败巴拿马 2019-01-11
  • 延不延迟退休应取决于这个岗位是否后继有人,如果后继者正排着队等待入职,就不能延迟,如果某岗位后继乏人,才需延迟。尤其“用税者岗位”是有限的社会资源,新生 2019-01-09
  • 第五届自治区道德模范风采 2019-01-09
  • 券商打新偏爱“独角兽” 平均获配超2万股  47家券商浮盈150万元 2019-01-05
  • 安徽:跟进固体废物倾倒长江案 监督公安机关立案2件2人 2018-12-20
  • 比利时30大胜巴拿马 卢卡库梅开二度 强队总算没有都凉凉 2018-12-12
  • 海淀北部生态科技新区新技术新产品项目推介会举行 2018-12-05
  • Today is:  
      English
    中文版
      Project Cases
      Zhejiang zhoushan dinghai power supply company
      福建36选7开奖结果查询
    Ningbo Xingbang Electric Co., Ltd.
    Add:No.8 Beisheng Road, Mazhu town, Yuyao City, Zhejiang,China
    Tel/Fax:0547-62465407
    Opening bank:Mazhu Sub-branch Bank of Yuyao Rural Cooperative Bank, Zhejiang province, China
    Zip code:315450
    E-mail:[email protected]
    //www.dqgff.com


    Current Location:Home Marketing Project Cases Zhejiang zhoushan dinghai power supply company

    Zhoushan power company Dinghai power supply subsidiary PAR (Project Acceptance Report) (2008) :

    "Remote control HV switch and control device" is distribution automation product cooperatively developed by Zhoushan power company Dinghai power supply subsidiary and Yuyao Xingbang electric Co., LTD. Primary product installed in 2006, only had the function of site remote control. Total solution was designed in April,2008, and had been run in simulational experiment garden of Yuyao Xingbang electric Co., LTD for a month for its necessary improvement. The instrument had been put into trial operation in substations which were in the charge of Dinghai power supply company. Seven switches were installed on distribution lines such as small-cross 711 line, ring 717 line, east along the port 722 line, coastal 922 line, TanFeng 923 line and small-cross 916 line. (as shown in the diagram below). From July to November in 2008 ,comprehensively analyzed project products totally according to technological parameters , and established the detailed operation files, set up the necessary function of miss operation blocking and issued a related operation system. At the end of November 2008, Dinghai zhoushan power company organization relevant experts to identify and summarize up some tips about actual operation status.
    Since July 5 2008,it has been running networks for 142 days. During operation, all functions has proved many times over very normal. no broken network phenomenon has been found during running networks, and the networking is reliable, telemetry data is correct and complete, interface is clear, and the operation is simple and easy to learn. The management of high voltage outdoor switch in 10 kV power distribution system is a heavy and complicated workload problem.With the product, it is easy to aware of outdoor voltage switch portion and state, voltage, current related data, whether to have such as the abnormal situation in the control room, it greatly reduced labor intensity,shortened work time, and greatly improved 10 kV power distribution work management .
    Since acceptance at end of November,2008, the number of switches online of Dinghai power supply subsidiary gradually increases from 7 original to 31 sets. Schematic diagram is as follows:


    Add:No.8 Beisheng Road, Mazhu town, Yuyao City, Zhejiang,China Tel/Fax:0547-62465407 E-mail:[email protected]
    Copyright © 2010-2011 Ningbo Xingbang Electric Co., Ltd.  China Supplier Design By Hisupplier Online Inc
  • 90后听障女孩北漂学舞 王力宏为她写歌:我欣然接受我的不完美 2019-02-01
  • 崇尚英雄 精忠报国——我们家的报国故事 2019-01-28
  • 报告显示: 中国海外人才归国逐年上升 2019-01-28
  • 豆渣-热门标签-华商生活 2019-01-27
  • 力度空前!个税起征点提高至每月5000元!还有这些消息与你的钱包有关 2019-01-11
  • 比利时并不轻松地击败巴拿马 2019-01-11
  • 延不延迟退休应取决于这个岗位是否后继有人,如果后继者正排着队等待入职,就不能延迟,如果某岗位后继乏人,才需延迟。尤其“用税者岗位”是有限的社会资源,新生 2019-01-09
  • 第五届自治区道德模范风采 2019-01-09
  • 券商打新偏爱“独角兽” 平均获配超2万股  47家券商浮盈150万元 2019-01-05
  • 安徽:跟进固体废物倾倒长江案 监督公安机关立案2件2人 2018-12-20
  • 比利时30大胜巴拿马 卢卡库梅开二度 强队总算没有都凉凉 2018-12-12
  • 海淀北部生态科技新区新技术新产品项目推介会举行 2018-12-05